РЕКОНСТРУКЦІЯ СПАЛЬНОГО КОРПУСА ПАНСІОНАТУ «ПРОМЕНИСТИЙ» В МІСТІ ЄВПАТОРІЯ (ВИРОБНИЧИЙ ДОСВІД)

Authors

  • V. P. Zahreba Vinnytsia National Technical University
  • Yu. O. Pliasovytsia Рrivate architectural workshop "Yu. Plyasovytsya"
  • T. V. Prylypko Vinnytsia National Technical University
  • B. V. Zahreba Research institute "Project- reconstruction "

Abstract

The practical experience of practice, the organization and the technology of a light built building structure of the reconstruction of the sleeping block of the holiday hotel “Promenystiy” in the tow of Yevpatorya are written here. The proofs of the cost and the laborious works of the reconstruction installation, used building works and materials in the “Euro-construction method” are shown. The problems of needing ways of vertical transportation of a luggage and coinciding it with the time – table of production are described are described this too by the decision ways.

Author Biographies

V. P. Zahreba, Vinnytsia National Technical University

Ph.D., assistant professor of urban planning and architecture

Yu. O. Pliasovytsia, Рrivate architectural workshop "Yu. Plyasovytsya"

architect, director

T. V. Prylypko, Vinnytsia National Technical University

Assistant Chair of Urban Planning and Architecture

B. V. Zahreba, Research institute "Project- reconstruction "

design engineers

Downloads

Abstract views: 4

How to Cite

[1]
V. P. Zahreba, Y. O. Pliasovytsia, T. V. Prylypko, and B. V. Zahreba, “РЕКОНСТРУКЦІЯ СПАЛЬНОГО КОРПУСА ПАНСІОНАТУ «ПРОМЕНИСТИЙ» В МІСТІ ЄВПАТОРІЯ (ВИРОБНИЧИЙ ДОСВІД)”, СучТехнБудів, vol. 8, no. 1, pp. 100–102, Jun. 2010.

Issue

Section

THE ORGANIZATION, ADMINISTRATION AND ECONOMY IN CONSTRUCTION

Metrics

Downloads

Download data is not yet available.